Kiebitzberg won an important public tender with the 2-part jetty system (dimensions: each 6.00 m long x 2.50 m wide, 30 cm freeboard) for the Magistrate's Office of the University City of Marburg. The special challenge of the project: the lowering and lifting mechanism of the integrated slipway (max. load 800 kg). In addition, a gangway with a total length of 8.00 m x 3.20 m width and a 1.50 m wide lane with a 28% inclination was manufactured and installed at the end of February 2013.


