Trawler MY Anassa, construction number KSW066 is a steel ship Explorer in multi-kink construction. Based on the classic fishing trawler, we developed a 15m luxury yacht for inland and coastal waters together with the owners.
The keel was laid on October 27, 2008 and on September 19, 2009 the ship was ceremoniously christened and handed over to the owner.
A special feature: the clearance height of the trawler is only 3.50m. Nevertheless, the ship is fully equipped: 2 main engines, galley, 6 berths, 2 fully equipped bathrooms with washing machine, and even a Vespa garage. The specification, equipment and interior design of the boat was carried out in close cooperation with the owners.
The Anassa's first major trip was along the Havel to Potsdam and Berlin.
With an autonomy of over 800 miles and a cruising speed of 10 knots, the Kiebitzberg Trawler 15.00 takes you to the most inaccessible anchorages.
The flying bridge and saloon are impressively large, offering generous space for six people. The interior of the steel trawler offers you full domestic comfort. With her clearance height of 3.50 m, the European inland waters can also be explored very well. This makes it possible to travel in the French canals as well as in the Mediterranean and North Sea. Two large cabins can accommodate up to six people on long cruises. A scooter space is provided for independent shore exploration.
Layout
The exciting thing about the Kiebitzberg® Trawler Trawler 1500 is that we have designed the layout adapt to your needs The owners of the first Kiebitzberg® Trawler 1500, for example, worked with us to develop the layout shown here. The criteria here were:
- spacious lounge
- Fully equipped pantry
- High-quality materials (Alcantara ceiling, walls & furniture in teak, maple & bird's eye maple veneer, Amtico flooring)
- Wheelhouse can be used by at least 4 people
- 6 berths (2 owners, 4 guests)
- Separate owner's & guest bathroom with shower, washbasin & WC)
- Washing machine
Ausführungsdetails
| Design: | Andreas Lewerken |
| Implementation planning: | Kiebitzberg Group |
| Manufacturing: | Kiebitzberg Group |
| Construction time: | approx. 1 year |
| Technical data | |
| Dimensions | - Overall length: 14.95 m |
| - Hull length: 14.40 m | |
| - Waterline length: 13.75 m | |
| - Hull width: 4.75 m | |
| - Draught: 1.45 m | |
| - Minimum clearance height: 3.50 m with folded mast | |
| - Clearance height max.: 7.00 m incl. mast | |
| - Displacement: approx. 34 tons | |
| Motorization | - Drive: 2 x 125 HP IVECO NEF 150 Diesel |
| - Power supply: Charging generator 6kW | |
| Tank volume | - Fuel tank: 2390 l diesel |
| - Heating oil tank: 1000 l | |
| - Fresh water tank: 1760 l | |
| - Gray water tank: 320 l | |
| - Black water tank: 400 l | |
| Authorization | - CE category: B |
| - CE category A is possible | |
| - Suitable for inland waterways! |



















